The evening of Hurricane Irma, Megawattage was called to assist Broward County EOC regarding a 1MG back-up generator which was not cooling and required a temperature thermostat adjustment. The generator’s flawless operation was necessary for the mayor to perform his speech. Megawattage responded immediately, since we are a 24/7 company, diagnosed and resolved the problem swiftly, and left three electricians on site overnight in order to ensure that the generator could be brought back up instantly in the event of another fail.