Megawattage Emergency Power Stiles Corporate Campus

Major lightning strike on a Sunday evening blew out the electrical in the FPL vault and the generator was overheating. Megawattage LLC crews arrived on site found the problem and fashioned a temporary fix. Because of the creativity of Megawattage LLC personnel, the facility was without power for only a short period of time and the UPS’s protected the servers during that time.